14 Preparing for installation

Unpacking and inspecting

ISDN BRI cards and external communication cables are shipped in
separate packages. To unpack them, follow the general precautions
recommended by computer and telephone equipment manufacturers.

Taking inventory

After unpacking, verify that all the equipment necessary is at the site
before installation begins. Check the equipment received against the
shipping documents. Note any shortages and report them to your sales
representative.
Copyright © 2003-2009 Nortel Networks
.
1 Large System Installation and Commissioning (NN43021-310) for a
description of how to install the modules.
Remove items that generate static charge from the installation site.
If the installation site is carpeted, spray it with an antistatic spray.
Ground yourself before handling any equipment.
Carefully remove the equipment from its packaging. Do not puncture or
tear the containers. Use scissors or a utility knife.
Inspect the equipment for obvious faults or damage. Report any
damaged component to your sales representative and the carrier who
delivered the equipment.
When unpacking the circuit cards, hold them only by their
nonconductor edges. Do not touch connector pins or components.
Keep the circuit cards in their antistatic bags until you are ready to
install them.
Do not stack the plug-in cards on top of each other. This can damage
the components and the printed circuits on the cards.
Nortel Communication Server 1000
ISDN Basic Rate Interface Installation and Commissioning
NN43001-318 03.01
11 May 2009

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs 1000eCs 1000m

Table of Contents