6. Install the tool tray to the top of the platform rail.
a. Lower tray (1) onto the upper platform rails (2) at
the front of the platform. Be certain the top cross
rail is inserted into the rail slot under the rear of
the tray and resting on the mast carry handle.
b. Once tray (1) is seated properly on the rails (2),
secure to the front side rails using the two tray
straps (3). Check that the tray is secure to the plat-
form rails.
c. To remove, release the two tray straps (3) that
secure the tray (1) to the platform rails (2) and lift
the tray upward off of the platform rails. (See Fig-
ure 3-12.)
THE WEIGHT OF OBJECTS CARRIED IN A PLATFORM TOOL TRAY, ALONG WITH
PERSONNEL AND EQUIPMENT PLACED IN THE PLATFORM MUST NOT EXCEED
THE MAXIMUM RATED PLATFORM CAPACITY. SEE TABLE 5-2.
3121296
Figure 3-12. Tool Tray Installation
1. Tool Tray
2. Platform Front Top Rails
LIFTPOD by JLG
SECTION 3 - MACHINE OPERATION
3. Tool Tray Straps
3-11