JLG LiftPod FT70 Operation, Safety, Service And Maintenance Manual page 91

Table of Contents

Advertisement

SECTION 6 - SERVICE/MAINTENANCE AND REPLACEMENT PARTS
Powerpack (option)
Powerpack - Switches & Controls (option)
General
Operator, Safety, Service & Maintenance Manual in Storage Pouch
All Decals/Placards Installed, Secure & Legible
Machine Inspection Due
No Unauthorized Modifications or Additions
All Relevant Safety Publications Incorporated
General Structural Condition and Welds
All Fasteners, Pins, Shields and Covers
Function Test of all Systems
Paint and Appearance
Record Inspection Date in Log Book
Notify JLG of Machine Ownership
NOTE: (a) - Lubricate mating surfaces of the mast mount once a month with a DTFE dry lubricant spray or equivalent.
6-6
Table 6-1. Preventative Maintenance & Inspection Schedule
Pre-Start Inspection
LIFTPOD by JLG
1, 3
1, 3, 7
1
1, 3, 7
Pre-Delivery or Frequent
Inspection
13
13
13
13
14
13
13
13
3, 4
13
14
14
2, 5
14 (delivery)
1, 3, 7
1, 3, 7
Annual (Yearly) Inspection
13
13
14
13
13
3, 4
1, 3
14
2, 5
14
14
3121296

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftpod ft140

Table of Contents