Fitting The Protective Hose - Fein KBU 110-4 M Repair Instructions

Metal core drilling
Hide thumbs Also See for KBU 110-4 M:
Table of Contents

Advertisement

Metal core drilling
Assembly

9.3.9 Fitting the protective hose

Steps that must be completed:
-
Fitting the stator
-
Fitting the grooved ball bearings
-
Fitting the armature
-
Fitting the sealing ring
-
Fitting the electronics
Tools:
-
Torx T15
-
Socket head wrench
2
3
4
5
C-SC_CSSM
1.
1
2.
3.
4.
5.
6.
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
Position the two terminals (1).
Position the protective hose (2).
Connect all cables as shown in the connection diagram.
Position the cable tie (3).
Position the housing (4).
Screw in the screw (5) [1.8 Nm].
23.01.2019
Page 72 of 75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jmu 404 m

Table of Contents