Positioning The Lever - Fein KBU 110-4 M Repair Instructions

Metal core drilling
Hide thumbs Also See for KBU 110-4 M:
Table of Contents

Advertisement

Metal core drilling
Assembly

9.1.8 Positioning the lever

Steps that must be completed:
-
Fitting the grooved ball bearings
-
Assembling the clutch and shafts
-
Assembling the lever
Tools:
-
Punch, 2 mm
-
Plastic hammer
C-SC_CSSM
1.
1
2.
3.
2
4.
5.
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
Grease the bolt (1).
Position the bolt (1).
Position the lever (2).
P
LEASE NOTE
Damage to the lever
The lever may be damaged if it is not positioned correctly.
When fitting the clamping sleeve (3), pay attention to the
position of the hole in the lever (2).
Position the clamping sleeve.
Repeat steps 1 to 4 on the opposite side of the machine.
!
23.01.2019
Page 54 of 75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jmu 404 m

Table of Contents