Fein KBU 110-4 M Repair Instructions page 63

Metal core drilling
Hide thumbs Also See for KBU 110-4 M:
Table of Contents

Advertisement

Metal core drilling
Assembly
9.3.2 Fitting the guide
1
2
3
4
C-SC_CSSM
s
10.
5
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
6.
Place the pressure piece (1) in the correct position.
7.
Position the two guide strips (2).
8.
Screw in the 14 cylinder head screws (3).
9.
Position the leaf spring (4).
Screw in the screw (5).
23.01.2019
Page 63 of 75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jmu 404 m

Table of Contents