Commissioning With Starter - Siemens SINAMICS G120 Operating Instructions Manual

Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Commissioning

4.5 Commissioning with STARTER

4.5
Commissioning with STARTER
Prerequisites
The STARTER commissioning tool features a project Wizard that guides you step-by-step
through the commissioning process. Configuring the inverter using the PC is significantly
more user friendly and faster than commissioning using the operator panel.
The following is required to commission the inverter via the PC:
● A PC connection kit for connecting the inverter to a PC.
● The installed STARTER software.
● The motor must be connected to the inverter.
58
Order no.: 6SL3255-0AA00-2AA1
Figure 4-3
PC connection kit
(supplied with the PC connection kit). You can download the latest version from the
Internet under the following address
(http://support.automation.siemens.com/WW/view/en/10804985/133100):
CU240S and CU240E Control Units, FW 3.2
Operating Instructions, 03/2009, A5E02440075B AA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu240s pnCu240s pn-fCu240eCu240sCu240s dpCu240s dp-f

Table of Contents