Commissioning; Commissioning With Starter - Siemens SINAMICS G120 CU250S-2 Series Compact Operating Instructions

Hide thumbs Also See for SINAMICS G120 CU250S-2 Series:
Table of Contents

Advertisement

Commissioning

Requirements for commissioning
Help for the operation and for the functions of the commissioning tools:
● STARTER videos
● Startdrive tutorial (http://support.automation.siemens.com/WW/view/en/73598459)
Commissioning with STARTER is described in the following.
4.1

Commissioning with STARTER

Creating a STARTER project
Procedure
In order to create a new project, proceed as follows:
1. In the STARTER menu, select "Project" → "New...".
2. Specify a name of your choice for the project.
You have created a new STARTER project.
CU250S-2 Control Units
Compact Operating Instructions, 05/2014, A5E32899990B AB
(http://www.automation.siemens.com/mcms/mc-drives/en/low-voltage-
inverter/sinamics-g120/videos/Pages/videos.aspx)
Use one of the PC tools STARTER or Startdrive to commission
the inverter.
You can access the inverter with STARTER or Startdrive either
via a USB connection or via the fieldbus.
System requirements and download:
• STARTER
(http://support.automation.siemens.com/WW/view/en/26233
208)
• Startdrive
(http://support.automation.siemens.com/WW/view/en/88851
265)
4
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120 cu250s-2 dpSinamics g120 cu250s-2 pnSinamics g120 cu250s-2 can

Table of Contents