● The Project Wizard for the (first) commissioning is concluded with the following summary:
● Finally, choose "Finish".
CU240S and CU240E Control Units, FW 3.2
Operating Instructions, 03/2009, A5E02440075B AA
Figure 4-15
Completing commissioning
Commissioning
4.5 Commissioning with STARTER
69