Repacking the System Components
S e n d d o c u m e n t c o m m e n t s t o n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
Ground lugs (do not include the ground cable) and mounting screws (two per lug)
•
Power cables (one or two for each 6-kW power supply unit)
•
Place one J-box half on the bottom pallet along two sides of the pallet as shown in View A of
Step 30
Figure
Place the other J-box half on the other two sides as shown in View A of
Step 31
Connect the two J-box pieces with six corro clips (three on each seam) as shown in View A of
Step 32
Figure
If your system included the optional front door and air intake frame, pack those items in their original
Step 33
packing materials and place them in the open area above the power supply box.
Place the corrugated cardboard lid on top of the package as shown in View B of
Step 34
Place each of the four edge protectors on one of the top edges of the lid (see View C of
Step 35
Secure the package to the pallet using at least four packing straps (two in one direction and two in the
Step 36
other direction) as shown in View C of
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
E-32
E-19.
E-19.
Appendix E
Repacking the Cisco Nexus 7000 Series Switch for Shipment
Figure
E-19.
Figure
E-19.
Figure
E-19.
Figure
E-19).
OL-23069-06