Appendix E
Repacking the Cisco Nexus 7000 Series Switch for Shipment
S e n d d o c u m e n t c o m m e n t s t o n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
Fold the two wide flaps over the narrow flaps (see Callout 10 in
l.
Tape the wide flaps together and to the box (see Callout 11 in
m.
Disconnect the switch from the console and the network as follows:
Step 5
On each supervisor module, disconnect the cables connected to the Console, Com/AUX,
a.
Management, and CMP Management ports.
Disconnect all of the cables from each of the I/O modules.
b.
Disconnect the one or two chassis grounding connections as follows:
Step 6
Unscrew the two M4 screws that hold each ground lug to the chassis. For the locations of the two
a.
grounding pads on the Cisco Nexus 7010 switch, see
page
Place the screws in the accessory kit.
b.
If the chassis includes an optional air filter, remove it as follows:
Step 7
On the lower left side and right side of the air filter, loosen the captive screw (one on each side) until
a.
it no longer connects with the chassis.
On the upper left side and right side of the air filter, simultaneously pull out the two spring pins (one
b.
on each side) and then pull the air filter away from the EMI frame and chassis.
If the chassis includes the optional midframe doors, remove the doors and their frames as follows:
Step 8
Remove the EMI panel, which holds the lower side frame pieces, by loosening the four captive
a.
screws on the EMI frame until they no longer connect with the chassis.
Remove each of the two side frames from the EMI panel by loosening and removing the two screws
b.
that hold each side frame piece to the EMI panel.
Reattach the EMI panel to the chassis by placing the EMI panel over the air intake area and aligning
c.
its captive screws to their holes in the chassis. Securely tighten each of the captive screws.
Remove each of the two front doors by loosening and removing the four screws that hold each door
d.
frame to the chassis.
e.
Remove the bottom frame by loosening and removing the three screws on the frame.
Loosen and remove the 6 screws that hold each side of the chassis (12 screws total) to the vertical
Step 9
mounting rails on the rack or cabinet.
Position a mechanical lift in front of the chassis and raise its platform to the bottom of the chassis (no
Step 10
more than 0.25 inches (0.6 cm) below the bottom of the chassis), so that you can push the chassis onto
the lift platform.
You must use a mechanical lift when lifting anything weighing over 120 pounds (55 kg).
Caution
Step 11
Lay the shipping pallet flat on the floor. This pallet includes a raised portion that is bolted to the larger
pallet. Make sure that the raised portion is on top.
You need four persons for the following step.
Caution
Use at least four persons to push the chassis onto the mechanical lift.
Step 12
OL-23069-06
3-14.
Figure 3-6 on page 3-13
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
Repacking the System Components
Figure
E-1).
Figure
E-1) with packing tape.
and
Figure 3-7 on
E-7