Replacing the Cable Management Frame on the Cisco Nexus 7018 Chassis
S e n d d o c u m e n t c o m m e n t s t o n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
Figure 9-31
1
Alignment pins
Use four M4x8 pan-head screws to loosely fasten the top cover to the chassis (see Callout 1 in
Step 7
Figure
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
9-60
Positioning the Top Cover with the Upper Cable Management Assemblies and the
Switch Chassis
9-32).
Chapter 9
2
Alignment holes
Replacement Procedures
OL-23069-06