Installing An Ac Power Supply Unit During Operations - Cisco Nexus 7000 Series Hardware Installation And Reference Manual

Hide thumbs Also See for Nexus 7000 Series:
Table of Contents

Advertisement

Replacing an AC Power Supply Unit During Operations
S e n d d o c u m e n t c o m m e n t s t o n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
1
2
3
4
5
6
7
8
9
Either replace the power supply unit or cover the empty power supply bay as follows:
Step 8

Installing an AC Power Supply Unit During Operations

After you remove an AC power supply, you can replace it with another power supply or replace it with
a blank plate until another power supply is available. If you need to install a DC power supply unit, see
the
Hazardous voltage or energy is present on the backplane when the system is operating. Use caution
Warning
when servicing. Statement 1034
To install an AC power supply unit while a Cisco Nexus 7000 Series switch is operating, follow these
steps:
Unpack the replacement power supply unit and place it on an antistatic mat. If you are unpacking a 6-kW
Step 1
power supply unit, you must also unpack one or two power cords. If you are unpacking a 7.5-kW power
supply unit, two power cords are already attached to the power supply unit.
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
9-6
Open the smaller of two boxes.
Place a padding sheet on the bottom of the
box.
Place the partitions on top of the padding.
Make sure that the cutout sections are on top.
Place thicker padding piece in the central slot,
with the groove side up.
Place the power supply unit in an ESD bag.
Place the bagged power supply unit in the
central partition slot. Make sure that the
extension of the front side fits into the
padding groove.
Coil each of the two power cables and place
each cable in a slot next to the power supply
unit.
Rotate both foldouts over the power supply
unit.
Place a padding sheet on top of the partitions.
If you are ready to replace the power supply unit, see the
During Operations" section on page
If the power supply bay is to remain empty, install a blank power supply filler plate (Cisco part
number 800-28658-01) over the opening, and secure it with the captive screws.
"Installing a DC Power Supply Unit During Operations" section on page
10 Fold the two narrow box flaps over the
padding.
11 Fold the two wide box flaps over the narrow
flaps.
12 Tape the two wide flaps together using
packing tape.
13 Insert each end of the smaller box into a
padding block.
14 Place the box and its padding blocks in the
larger box.
15 Fold the two narrow box flaps over the
padding blocks.
16 Fold the two wide box flaps over the narrow
flaps.
17 Tape the two wide flaps together using
packing tape.
"Installing an AC Power Supply Unit
9-6.
Chapter 9
Replacement Procedures
9-10.
OL-23069-06

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7009Nexus 7018Nexus 7010

Table of Contents