USC U-Batch Operator's Manual page 28

Treater
Table of Contents

Advertisement

U-BATCH™ TREATER
MAIN SCREEN
12. BLEND TIME REMAINING:
This indicator displays the progress of the entire
batch run from start to finish. The Mixer run time in the upper right hand corner of the
screen will show that time in seconds.
13. LIQUID APPLICATION:
This indicator displays the progress of the liquid pump
stand delivering the pre-defined amount of treatment to the hopper and the purging
of the supply line.
14. BLENDING LIQUID:
This indicator displays the progress of the timed mixing
process after all of the liquid has been applied.
15. POWDER APPLICATION:
This indicator displays the progress of the powder
applicator delivering the pre-defined amount of dry material to the hopper.
16. BLENDING POWDER:
This indicator displays the progress of the timed mixing
process after all of the dry material has been applied.
17. PAUSE BLEND:
When a batch is in process this indicator is appears.
The operator may manually press this button at any time during the run to stop the
process. It will also appear when a system fault has occurred.
A
B
17A. PAUSE BLEND:
If the system was paused manually, pressing this button and
holding it for two seconds will restart the run from where it was stopped. If the system
was stopped automatically. The system fault will need to be resolved, then press
Continue Blend to restart.
Page 28

Advertisement

Table of Contents
loading

Table of Contents