USC U-Batch Operator's Manual page 17

Treater
Table of Contents

Advertisement

8. Attach the yellow connector on the end of this wire from PJ2305 to the black
connector attached to the wire from the top sensor on the discharge slide gate
Bimba cylinder.
9. Attach the yellow connector on the end of this wire from PJ2306 to the black
connector attached to the wire connected to bottom sensor on the discharge slide
gate Bimba cylinder.
10. Connect the two pin cable from Pump Stand to the PJ2012 pump motor connector.
11. Connect the four pin cable from the IFM volumetric flowmeter to the PJ2804
IFM / E&H FM COMM connector.
12. Connect the four pin cable from the Schneider relay TM3DQ8 on the hydraulic
power assembly to the PJ2549 Raise / Lower solenoid connector. This will only
be required if the treater was purchased with the hydraulic lift option.
13. If this installation is using more than one liquid pump stand, connect the cable from
the pump stand motor you wish to be controlled by Auxiliary 1 button to the PJ2511
AUX PORT #1 connector and connect the cable from the pump stand motor you
wish to be controlled by Auxiliary 2 button to the PJ2512 AUX PORT #2 connector.
10
U-BATCH™ TREATER
SET-UP
8
11
12
9
13
Page 17

Advertisement

Table of Contents
loading

Table of Contents