USC U-Batch Operator's Manual page 20

Treater
Table of Contents

Advertisement

18. Run one 1/4 inch line from the AUGER AIR SEAL fitting on the bottom of the
pneumatic control assembly to the AIR SEAL fitting on the air bulkhead plate.
19. Run one 1/4 inch line from the LIQUID AIR PURGE fitting on the bottom of the
pneumatic control assembly to the LIQUID PURGE fitting on the air bulkhead plate.
20. Run one 1/4 inch line from the DSCHG GATE OPEN fitting on the bottom of the
pneumatic control assembly to the DISCHARGE GATE OPEN fitting on the air
bulkhead plate.
21. Run one 1/4 inch line from the DSCHG GATE CLOSE fitting on the bottom of the
pneumatic control assembly to the DISCHARGE GATE CLOSE fitting on the air
bulkhead plate.
22. Run one 1/4 inch line from the INLET GATE OPEN fitting on the bottom of the
pneumatic control assembly to the INLET GATE OPEN fitting on the air bulkhead
plate.
23. Run one 1/4 inch line from the INLET GATE CLOSE fitting on the bottom of the
pneumatic control assembly to the INLET GATE CLOSE fitting on the air bulkhead
plate
22
20
19
Page 20
U-BATCH™ TREATER
SET-UP
23
21
18