USC U-Batch Operator's Manual page 18

Treater
Table of Contents

Advertisement

14. Attach the power cable from the mix motor to the PJ2006 Mixer connector.
15. Attach the power cable from the hydraulic lift motor to the PJ2016 Hydraulic Motor
connector. This will only be required if the treater was purchased with the hydraulic
lift option.
14
16. It is required that the air supply have an in-line
customer supplied air dryer to protect the air
system from contamination. Supply a constant
flow at 4 SCFM of air with the capability of a 25
SCFM per minute for one to two minute bursts from
the dryer, through a 1/2 inch line to the air regulator
intake port located on the back of the pneumatic
control assembly.
Page 18
U-BATCH™ TREATER
SET-UP
16
15

Advertisement

Table of Contents
loading

Table of Contents