7. Have a certified electrician provide power to the
U-Batch™ Treater system. Provide convenient shutdown
switches, comply with local electrical codes and ensure
that the system is properly grounded and bonded.
All USC control panels must be connected adhering to
the same electrical requirements as specified in the main
control panel on the power requirement tag (right), or the
electrical schematic shipped with the piece of equipment.
This will power the U-Batch™ Treater.
If you purchased a treater with a 3 Phase motor and have completed step 7,
you need to verify that the motor is turning in the correct direction.
Remove the mixer motor drive belt guard and drive belt. Plug the power cable
from the mix motor into the PJ2006 connector on the bottom of the control panel
(see page 18, step 14).
Rotate the power switch on the control panel to the ON position. Once the HMI
screen has booted up and the Click To Continue message is flashing (see page 25),
touch anywhere on the screen and the main HMI screen appears. Press the Utilities
button. From the Utilities screen, press the H-O-A button (see page 37). From the
Mixer module at the top of the screen, press the HAND button to turn on the mixer
motor. The mix motor drive pulley should be turning CLOCKWISE. If it is not,
correct the incoming power. Replace the drive belt and set to the correct tension
(see page 58). Then reinstall the drive guard
Page 16
U-BATCH™ TREATER
SET-UP
Incoming power connected to
these terminals in the U-Batch™
Treater Control Panel