6 Trial Operation (Checking Servomotor Operation)
Multi-Winding Drive Unit, SERVOPACKs, and Converters
Inspect and check the following items, and take appropriate measures before per-
forming trial operation if any problem exists.
• Are all installation, wiring and connections correct?
• Is the correct power supply voltage being supplied to the multi-winding drive unit,
SERVOPACKs, and converters?
Installing the Servomotor, Multi-Winding Drive Unit, SERVOPACKs,
and Converters
Install the servomotor, multi-winding drive unit, SERVOPACKs, and converters
according to the installation conditions.
<Note>
• Be sure to secure the servomotor to the equipment, or the servomotor may turn
over when it starts rotating.
• Do not connect anything to the servomotor shaft.
6-4
Secure the servomotor to the machine.
Do not connect any load to the shaft.