6 Assembly and installation of the DualGuard-S
ATTENTION!
Short-circuits and incorrect polarity can damage the battery
bank or the installations of a DualGuard-S system.
When interfering with the electrical system (e.g. connecting
control or signal lines) or electronics (e.g. plugging or unplug-
ging modules in the control cabinet), the ESD protection must
be observed! Never switch the mains or battery power supply
on or off ander load. In both cases, the system must have
been blocked beforehand via the control unit.
If the Batterys or battery-powered parts of the system are
handled improperly, there is a risk of injury or death due
to high currents or electric arcs, which can occur briefly at
battery discharge.
It is essential that you observe the instructions in this manual
for disconnecting or connecting the Batterys (see „Connec-
ting the battery power supply").
Ensure that the polarity of the battery banks (battery cabinets
/ racks) is correct.
ATTENTION!
Short circuits and incorrect polarity can damage the battery
bank or the installations of a DualGuard-S system.
At interventions in the electrics (e.g. connection of control or
signal lines) or electronics (e.g. plugging or pulling modules in
the switch cabinet), the ESD protection must be observed!
Never switch the mains or battery power supply on or off
under load. In some cases, the system must have been
blocked beforehand by the control unit.
Assembly
Requirements for the work surface / installation site:
Installation on level groand with sufficient bearing capacity.
The installation site must be levelled horizontally.
Holes are provided in the floor plate for fastening to the floor
or screwing to a base.
14
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de
DANGER!
Installation
Disconnect all connecting cables (mains and battery power
supply) from the power supply and secure them against
unintentional reconnection (e.g. removal of all fuses and
corresponding protection of the distributor of the general
mains supply and the battery bank with information signs
and/or locks).
Install the connecting cables (mains and battery power supp-
ly) with sufficient length reserve up to the installation location
of the DualGuard-S cabinet. Carry out this work properly and
professionally in accordance with the applicable directives
and standards.
Secure all cable entries with the M cable glands provided.
If possible, lay the connecting cables in the cable areas of
the control cabinet.
In this illustration, outgoing cables for mains and battery
power supply of substations were attached to the cabinet
wall on C-rails (item no. 40071347126) with corresponding
cable clamps. Do not leave any connecting cables tempo-
rarily loose!
Later additions or conversions of the system equipment are
possible, but the description of such interventions in the
internal equipment is not part of these instructions, as such
work is reserved for specially trained CEAG personnel!
The installation of general and emergency lighting is not
covered by these instructions.
Install, install and connect the lighting equipment in accor-
dance with the relevant electrical engineering directives and
standards. In addition, observe all directives and regulations
of the country in which the system is installed and operated.
NOTE!