Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de
16.3. Table Configure basic settings (login = untrained specialist)
Icon BDM/BBS
Icon
Service 1 Settings
Icon Test setup
Icon
Automatic
duration test
Icons for program-
ming the duration
test
Activate/deactivate
test
date
start time
Duration test
time
start time
Duration test
Distance between
tests
Icon Test setup
Icon for automatic
function test
Enter the warning and error thresholds
in % for voltage and temperature.
Already set ex works for EATON
batteries
Allow high charge= The high charge
can be switched off in environmental
conditions such as low air flow or too
high temperatures.
LT Start delay: After the end of the
endurance test the recharging is
delayed.
Quick Check Battery Interruption= For
countries that require shorter inter-
ruption detection times other than EN
50171.
Pub/sub= The transmission of the
battery values to a substation.
Actuate
Date Start time Duration test
Time Start time Duration test
Distance between tests
Actuate
Use the arrow keys to enter the start
time, time and distance between two
tests.
Actuate
31