ADFM® Flow Meter
Section 2 Setup and Installation
2.4 Preparing for
Installation
2.4.1 Installation Checklist
2-18
Before deployment, your system configuration and site charac-
teristics must be determined. This section will help you to
prepare the ADFM for deployment.
The general sequence of steps in the installation and deployment
of the ADFM are as follows:
1. Determine the installation site and sensor mounting loca-
tion according to site requirements.
2. Measure and record all channel dimensions and determine
geometry.
3. Prepare your laptop PC with Isco WinADFM software, to
take to the installation site.
4. Perform pre-installation equipment and operational
checks.
5. Install and secure the ADFM controller, and connect the
sensor.
6. Connect power and conduct final tests.
7. Program the desired data logging parameters into the
ADFM.