Installation And Overview - Teledyne 300 Instruction Manual

Carbon monoxide analyzer
Hide thumbs Also See for 300:
Table of Contents

Advertisement

1.5 Installation and overview

The Model 300 is shipped with the following standard equipment:
1.
Power cord.
2. Instruction manual.
To avoid personal injury, always use two persons to lift and
Upon receiving the Model 300 please do the following:
1.
Verify no apparent shipping damage. (If damage has occurred please
advise shipper first, then Teledyne API.)
2.
When installing the Model 300, allow a minimum of 4 inches (100mm) of
clearance at the back of the instrument and 1 inch (25mm) of clearance on
each side for proper ventilation. Also, be sure that the clearance below the
chassis is unobstructed by at least the height of the instrument feet.
3.
Connect sample inlet line to the sample port on rear panel.
SEE FIGURE 1.4 FOR REAR PANEL PNEUMATIC
CONNECTIONS. SAMPLE GAS SHOULD ONLY COME
INTO CONTACT WITH PTFE, GLASS OR STAINLESS
STEEL. LEAK CHECK ALL FITTINGS WITH SOAP
MAXIMUM PRESSURE FOR LEAK CHECK IS 5 PSI.
Connect the exhaust fitting on the rear panel (See Fig. 1.4) to a
4.
Connect IZS inlet input (if installed) to a clean, dry air supply.
5.
Connect a recording device to the terminal strip connections on the rear
panel (See Figure 1.2).
6.
Connect the power cord to an appropriate power outlet (see the serial
number tag for correct voltage and frequency).
P/N 02163G Teledyne API Model 300 CO Analyzer Instruction Manual - Page 5
CAUTION
carry the Model 300.
NOTE
SOLUTION.
CAUTION
suitable vent outside the analyzer area.

Advertisement

Table of Contents
loading

Table of Contents