Flatten Six Center Tabs On Base Section - Teledyne ADFM Pro20 Installation And Operation Manual

Acoustic doppler flow meters
Hide thumbs Also See for ADFM Pro20:
Table of Contents

Advertisement

Figure 2-30 Flatten six center tabs on base section
Figure 2-31 Assembling the ring and mounting the sensor
2. Assemble the Scissors Ring, attach the sensor, and secure
the cables above ground.
3. Assemble the ring, making sure the tongue sections are
fully inserted into the slotted sections and over the secur-
ing buttons.
4. Bolt the sections together to increase safety and prevent
the assembly from being dislodged or separated by the flow
stream.
Bolt holes
ADFM® Flow Meter
Section 2 Setup and Installation
Pro20 sensor with debris fairing
2-31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adfm hot tap

Table of Contents