Mounting The Switch In A Standard 19" Rack; Power On; Power Failure - D-Link DGS-3200 Series User Manual

Layer 2 gigabit ethernet managed switch
Hide thumbs Also See for DGS-3200 Series:
Table of Contents

Advertisement

Mounting the Switch in a Standard 19" Rack

Power On

1. Plug one end of the AC power cord into the power connector of the Switch and the other end into the local power source
outlet.
2. After powering on the Switch, the LED indicators will momentarily blink green. This blinking of the LED indicators
represents a reset of the system.

Power Failure

As a precaution, in the event of a power failure, unplug the Switch. When power is resumed, plug the Switch back in.
DGS-3200 Series Layer 2 Gigabit Ethernet Managed Switch
Figure 2- 5. Installing the DGS-3200-10 in a rack
Figure 2- 6. Installing the DGS-3200-16 in a rack
10

Advertisement

Table of Contents
loading

Table of Contents