®
xStack
DES-3528/DES-3552 Series Layer 2 Managed Stackable Fast Ethernet Switch Hardware Installation Guide
Mounting the Switch in a Standard 19" Rack
CAUTION: Installing systems in a rack without the front and side stabilizers installed could cause the
rack to tip over, potentiall y resultin g in bodily in jury unde r certai n circu mstances. The refore, alway s
install the stabilizers before insta lling components in the ra ck. After installing co mponents in a rack, do
not pull mo re than one component out of the ra ck on its slid e assemblies at one time. The weight of
more than one extended component could cause the rack to tip over and may result in injury.
Power On (AC Power)
Plug one end of the AC p ower co rd int o the powe r con nector of the Switch a nd the other end into the local po wer
source outlet.
After the Switch is powered
represents a reset of the system.
Power Failure (AC Power)
As a precaution for A C p ower supply units, in th e event of a powe r failure, unplu g the Switch. Wh en power ha s
resumed, plug the Switch back in.
Figure 2- 3. Installing the Switch in a rack
on, the LED indicators will momentarily blin
k. This blinking of
13
the LED indicators