Connecting The Supply And Work Lines - Festo CPV-VI Series Manual

Valve terminal
Table of Contents

Advertisement

3. Installation

3.3.2 Connecting the supply and work lines

Festo P.BE-CPV-EN en 0005e
Please note
S Seal all connections not required for the functioning of
the CPV valve terminal with blind plugs
(see Appendix B.2).
S In the case of valves which are not used, seal connec-
tions 2 and 4 with blind plugs.
S If you are using valve plates with Ident. code C (two
2/3-way valves in basic position blocked) with
CPV10/14 valve terminals and you wish to implement
the function "Closed in neutral position", you will re-
quire the 5/3G valve actuator. This will be fitted onto the
above mentioned valve plate (see chapter 2.3 "Fitting
the valve actuator ").
S Depending on the tool used, connect the work lines as
follows:
– Screw connector with hexagon socket head: any se-
quence is possible.
– Screw connector with external hexagon socket head:
connection must be made from left to right (space for
wrench).
3-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv10-viCpv14-viCpv18-vi

Table of Contents