Fitting The Cpv Valve Terminal To The Pneumatic Multipin - Festo CPV-VI Series Manual

Valve terminal
Table of Contents

Advertisement

2. Fitting

2.2.2 Fitting the CPV valve terminal to the pneumatic multipin

2-22
Proceed as follows
S
With CPV valve terminals with IC connection, insert the
accompanying socket head screws into the fastening ho-
les. With MP, AS-i, DI or CP connections, the socket head
screws are already in the fastening holes under the elec-
tric sub-base and are secured against loss.
S
Lay the 3-part or 4-part seal for sealing the supply chan-
nels into the grooves in the left or right-hand end plate.
S
In order to seal the work channels, carefully press the two
seals into the thread of the work connections.
S
Fasten the CPV valve terminal with the 4 socket head
screws on the multipin. Tighten the screws in diagonally
opposite sequence with 2 Nm (CPV10/14) or 4 Nm
(CPV18).
Fig. 2/14: Fitting the CPV valve terminal onto the pneumatic
multipin
Festo P.BE-CPV-EN en 0005e

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv10-viCpv14-viCpv18-vi

Table of Contents