Kongsberg EM 712 Maintenance Manual
Cable plan - Processing Unit
The Processing Unit cables include those used to connect the EM 712 Processing Unit to
AC mains power, and to the transmitter and receiver units. One Ethernet cable is used to
connect the Processing Unit to the Hydrographic Work Station.
Cables identified with an asterisk (*) are system cables. These cables are supplied with
the EM 712 delivery.
Processing Unit
A
Related topics
Processing Unit rear panel description, page 78
List of EM 712 cables, page 164
154
451106/B