74 | Hardware Installation and Maintenance Guide for SG5700 Appliances
b. Click Reboot Controller.
The appliance reboots and rejoins the grid. This process can take up to 20 minutes.
c. From the Grid Manager, monitor the status of the upgraded appliance Storage Node.
Verify that the Storage Node returns to the expected status.
Related tasks
Configuring network links
on page 36