NetApp StorageGRID SG5700 Series Hardware Installation And Maintenance Manual page 74

Integrated storage and computing platform
Hide thumbs Also See for StorageGRID SG5700 Series:
Table of Contents

Advertisement

74 | Hardware Installation and Maintenance Guide for SG5700 Appliances
b. Click Reboot Controller.
The appliance reboots and rejoins the grid. This process can take up to 20 minutes.
c. From the Grid Manager, monitor the status of the upgraded appliance Storage Node.
Verify that the Storage Node returns to the expected status.
Related tasks
Configuring network links
on page 36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storagegrid sg5712Storagegrid sg5760

Table of Contents