Installing Sfp Or Sfp+ Transceivers In The Switches; Figure 51: Installing An Sfp Transceiver - Allied Telesis x530L Series Installation Manual

Stackable gigabit layer 3+ ethernet stand-alone switches
Hide thumbs Also See for x530L Series:
Table of Contents

Advertisement

Chapter 8: Cabling the Networking Ports

Installing SFP or SFP+ Transceivers in the Switches

102
This section contains installation instructions for SFP or SFP+
transceivers in ports 25 to 28 in the AT-x530L-28GTX and AT-x530L-
28GPX or ports 49 to 52 in the AT-x530L-52GTX and AT-x530L-52GPX
switches.
The following illustrations show a transceiver with a duplex LC connector.
The connectors on your transceivers may be different.
To install transceivers, perform the following procedure:
1. Select a port for the transceiver.
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top port, position the
transceiver with the Allied Telesis label facing up. If you are installing
the transceiver in a bottom port, position the transceiver with the label
facing down. Refer to Figure 51.
Figure 51. Installing an SFP Transceiver
4. Slide the transceiver into the port until it clicks into place.
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 through 5 to
install the remaining transceivers in the switch.
2 5
2
5 G /
2 . 5 G
/ 1 G
/ 1 0 0
2 6
S F
P +
2 7 /
S 1
1 0 G
/
1 G
4574

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents