FP PostBase Vision Reference Manual page 33

Hide thumbs Also See for PostBase Vision:
Table of Contents

Advertisement

Connection on the postage meter
Power connection
Installation and commissioning
Connecting the feeder
Caution! If the feeder was previously in a
cold environment (i.e. below 10 °C / 50 °F):
Wait at least 2 hours after unpacking before
connecting the feeder. The feeder needs this
time to adjust to the environmental conditions.
• Connect the feeder connection cable to the
CAN-BUS interface of the postage meter.
Screw the connector on tightly.
• Plug the power cable into the power con-
nection for the feeder.
• Only then plug the power cable into the
power socket.
33

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision and is the answer not in the manual?

Questions and answers

Edna R Carlisle
March 11, 2025

HOW TO SEND MAIL CERTIFIED

Jeannie Gates
May 2, 2025

How can you manually adjust the postage rate in Postbase Vision? I need to add more postage to my package.

Table of Contents

Save PDF