FP PostBase Vision Reference Manual page 30

Hide thumbs Also See for PostBase Vision:
Table of Contents

Advertisement

30
PostBase Vision
Icon:
Full cartridge
Home screen (example)
Please wait: The PostBase Vision will now
prepare the cartridge for use.
PostBase Vision displays the "Full cartridge"
icon in the menu bar.
Load postage / Contact data center
In order to meter, the PostBase Vision must
have corresponding postage credit. This re-
quires contact with the data center.
• Follow the instructions on the display.
Installation complete
When PostBase Vision displays the Home
screen, the postage meter installation has
been successfully completed.
To install the "PostBase Vision Feeder", con-
tinue with Step 7.
The M
button is used to access other
ENU
system settings (e.g. PIN protection, standby
time).
Volume, display inclination and brightness
can be adjusted directly on the display frame.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision and is the answer not in the manual?

Questions and answers

Edna R Carlisle
March 11, 2025

HOW TO SEND MAIL CERTIFIED

Jeannie Gates
May 2, 2025

How can you manually adjust the postage rate in Postbase Vision? I need to add more postage to my package.

Table of Contents

Save PDF