Step 4: Connecting The Postbase Vision - FP PostBase Vision Reference Manual

Hide thumbs Also See for PostBase Vision:
Table of Contents

Advertisement

23
Installation and commissioning
• Fill sealer with SEALIT sealing liquid.
• Check the filling level. The sealer should
be filled roughly up to the "max" mark.
• Close the filling opening with the cover.
• If necessary: Dry the sealer outside.
Step 4:
Connecting the PostBase Vision
Caution! If the PostBase Vision was previ-
ously in a cold environment (i.e. below 50 °F /
10 °C): Wait at least 2 hours after unpacking
before connecting the postage meter. The
PostBase Vision needs this time to adjust to
the environmental conditions.
Caution! Do not connect the PostBase Vision
Feeder (the optional automatic feeder) until
Step 7. The PostBase Vision postage meter
must be fully installed to do this. Otherwise
the Feeder will not be recognized by the post-
age meter. The mailing system will not work.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision and is the answer not in the manual?

Questions and answers

Edna R Carlisle
March 11, 2025

HOW TO SEND MAIL CERTIFIED

Jeannie Gates
May 2, 2025

How can you manually adjust the postage rate in Postbase Vision? I need to add more postage to my package.

Table of Contents

Save PDF