Step 2: Assembling The Postbase Vision - FP PostBase Vision Reference Manual

Hide thumbs Also See for PostBase Vision:
Table of Contents

Advertisement

20
PostBase Vision

Step 2: Assembling the PostBase Vision

Installation site
The installation site for the PostBase Vision
mailing system must meet the following
requirements:
– Firm, level, low vibration and horizontal
base, which offers sufficient space for the
mailing system in the ordered version.
The dimensions of the individual compo-
nents can be found at page 177.
– Room temperature in the range from 59 °F
to 95 °F / 15 °C to 35 °C.
– No direct sunlight.
– Relative humidity within a range of 15 % to
80 %, non-condensing.
– Power socket in the immediate vicinity.
– Network connection with internet access.
• The PostBase Vision postage meter must
be placed on a suitable surface.
• Remove the protective film from the
display.
Assembling the weighing platform
• Hold the weighing platform as shown in
the illustration and place it onto the scale
receptacle. The long slot in the foot of the
weighing platform must slide in the coun-
terpart on the scale receptacle.
Long slot

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision and is the answer not in the manual?

Questions and answers

Edna R Carlisle
March 11, 2025

HOW TO SEND MAIL CERTIFIED

Jeannie Gates
May 2, 2025

How can you manually adjust the postage rate in Postbase Vision? I need to add more postage to my package.

Subscribe to Our Youtube Channel

Table of Contents

Save PDF