FP PostBase Vision Reference Manual page 151

Hide thumbs Also See for PostBase Vision:
Table of Contents

Advertisement

Leg spring
Bolt
Rocker
Uniform gap
Absorption felt
Installing the rocker with moistening felt
The rocker features two clips that engage on
the two bolts at the sealer.
• Fit the new rocker such that one leg of the
leg spring is located in the rocker groove
and the other leg in the sealer slot.
• Hold sealer in place, and exerting moder-
Clip
ate pressure, push the rocker onto the
sealer such that the two clips engage on
the bolts.
Check
• Check the correct seat:
– The absorption felt must be perpendicu-
larly suspended in the liquid reservoir. Its
lower edge should roughly reach the bot-
tom.
– The gap between rocker and sealer
housing must be uniform. (The rocker
must neither jut out nor touch the hous-
ing.)
• Fill with SEALIT sealing liquid (see
page 148).
• Connect the sealer to the postage meter
(see page 22).
Maintenance and care
151

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision and is the answer not in the manual?

Questions and answers

Edna R Carlisle
March 11, 2025

HOW TO SEND MAIL CERTIFIED

Jeannie Gates
May 2, 2025

How can you manually adjust the postage rate in Postbase Vision? I need to add more postage to my package.

Table of Contents

Save PDF