Doosan DE08TS Disassembly/Assembly page 73

Hide thumbs Also See for DE08TS:
Table of Contents

Advertisement

9. Put the bearing cap in position and tighten the
bolts to a torque of 300 N � � m (220 lb � � ft).
10. Remove the main bearing cap and measure the
Plastigage. The bearing clearance for new
bearings must be 0.025 to 0.075 mm (.001 to
.003 in.).
11. Put clean engine oil on the bearing and the
crankshaft journal.
12. Install main bearing cap (2). Tighten the bolts to a
torque of 300 N � � m (220 lb� � ft).
13. Do Steps 8 through 12 for the other main
bearings.
IEED144P
14. Measure the crankshaft end play. The end play
must be 0.15 to 0.325 mm (.006 to .013 in.).
15. Put clean engine oil on the connecting rod bolt
threads. Install all bolt one of the connecting rod
caps.
16. Use Plastigage to check the bearing clearance of
the connecting rods. Install connecting rod cap
(7) and tighten the to a torque of 180 N � � m (133
lb � � ft).
IEED138P
17. Remove the connecting rod cap and measure the
18. Put the connecting rod cap in position and install
7
19. Do steps 16 through 18 for the other connecting
End By :
a. Install flywheel housing.
b. Install timing gear case.
Typical Example
c. Install oil pump.
71 of 73
1
2
4
Plastigage. The bearing clearance for new rod
bearing must be 0.025 to 0.075 mm (.001 to .003
in.).
the nuts. Tighten the nuts to a torque of 180 N � � m
(133 lb � � ft).
rod caps.
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D100D120D150D130s-5D160s-5D110s-5

Table of Contents