Display Control; Power On/Off; Schedule Automatic Power On/Off; Power On/Off Repeat And Delay Control - Planar Wallnet Setup & Operation

Table of Contents

Advertisement

Display Control

You need Operator authority to do anything here.

Power On/Off

Power On/Off controls lamp power, not the AC
power. You cannot control AC power through
WallNet.

Schedule Automatic Power On/Off

This section has four options for which you can
schedule an automatic power on/off. The options
are: no automatic power on/off, same daily
schedule, Monday-Friday same schedule and
weekends off. Or each day has its own schedule.
You can only select one of the schedule types.
The default is No automatic power on/off.
Remember to use 24-hour time. Two thirty in the
afternoon is 1430 or 14:30 and not 230 or 2:30.

Power On/Off Repeat and Delay Control

Sometimes when you send a Power On command
to a large wall of Planar displays, one or two do
not turn on. This section allows you to broadcast
the command at set intervals or set a Delay and
send the Power On command to displays
individually.
If you leave these three boxes blank, WallNet
sends a broadcast On command, waits ten
seconds, and then goes through the list of
displays in RS232 Setup, checking the state of the
lamp(s). Any display that reports the lamp(s) not
On gets another On command. This continues for
up to ten tries every ten seconds, stopping when
no more displays report Off.