Komatsu ecot3 PC300LC-8 Shop Manual page 171

Hydraulic excavator
Table of Contents

Advertisement

10 Structure, function and maintenance standard
3.
When lowering boom
Operation
When the boom is lowered, pilot pressure from
q
the PPC valve presses pilot spool (2).
q
Pressurized oil in chamber (b) inside the pop-
pet is drained via orifice (c).
q
Pressurized oil of the boom bottom flows to ori-
o
fice (a)
chamber (b)
and the pressurized oil in chamber (b) lowers.
As the pressure of chamber (b) lowers under
q
the pressure of port (B), poppet (5) opens.
q
Pressurized oil from port (B) is led to port (A)
and then flows to the control valve.
PC300, 350-8
o
o
orifice (c)
drain (T),
SEN01994-01
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecot3 pc300-8Ecot3 pc350lc-8Ecot3 pc350-8

Table of Contents