Komatsu ecot3 PC300LC-8 Shop Manual page 161

Hydraulic excavator
Table of Contents

Advertisement

10 Structure, function and maintenance standard
LS select valve
Function
Prevents high LS pressure from the swinging
q
from entering the LS circuit of work valves
while the swinging and work equipment are in
combined operation.
Prevents high pressure generated during
q
swing drive and improves operability of work
equipment.
a The illustration shows the state of simulta-
neous operation of swinging and R.H. travel.
[(BP) pressure ON]
1.
Valve
2.
Spring
3.
Piston
4.
Piston
5.
Swing spool
6.
L.H. travel spool
7.
Arm spool
8.
LS shuttle valve
9.
LS circuit
PC300, 350-8
Operation
1.
If pilot pressure (BP) is OFF
q
Since pilot pressure (BP) is OFF, piston (3) is
pressed to the left by spring (2).
q
When swing-operated, swing LS pressure (P1)
enters port (A) after passing swing spool (5).
q
Valve (1) is pressed to the left and ports (A)
and (B) are interconnected.
Swing LS pressure (P1) flows to LS shuttle
q
valve (8).
2.
If pilot pressure (BP) is ON
q
If pilot pressure (BP) is ON, BP pressure con-
tracts spring (2), and piston (3) shifts to the
right.
q
Valve (1) is pressed to the right and intercon-
nection between ports (A) and (B) is closed.
q
Swing LS pressure (P1) stops flowing to LS
shuttle valve (8).
q
If swing LS pressure (P1) rises, other LS cir-
cuits are not affected.
SEN01994-01
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecot3 pc300-8Ecot3 pc350lc-8Ecot3 pc350-8

Table of Contents