Selecting And Preparing The Installation Site; Configurations - SolarEdge Home Battery 48V Installation Manual

Table of Contents

Advertisement

10
  Selecting and Preparing the Installation Site

Selecting and Preparing the Installation Site

Make sure to observe the following requirements, when selecting an installation site.

Configurations

 
The term Battery module refers to a single battery. The term Battery Tower or Tower
refers to a number of modules stacked on top of each other and connected in parallel.
The term Battery pack or Battery refers to all the battery modules connected to each
other and to the same inverter, in one or two towers.
Connect up to 5 battery modules in two towers (maximum 3 in a tower).
 
Home Battery 48V Installation Guide MAN-01-00954-1.1

Advertisement

Table of Contents
loading

Table of Contents