Secondary Unit Interface - SolarEdge SE8K-N4 Installation Manual

Three phase inverter with synergy technology
Table of Contents

Advertisement

Secondary Unit Interface

Figure 10: Connection Unit with MC4 Connectors bottom interface
 
AC output: cable gland for connection to the grid, M50 20-38mm diameter
l
 
AC protective earth gland: cable gland for grounding , 9-16 mm diameter
l
 
Communication gland: for connection of   c ommunication options. Refer to Setting Up Communication  
l
 on page 54. 
Secondary Unit Interface
 
The Secondary units connectors are for connection to the Primary Unit:
l
 
DC (MC4) connectors: for connection of the PV installation
o
 
Communication connector: for communication options
o
 
AC connector: for connection of the AC 
o
 
Mounting hole: for securing the unit to the bracket and for connecting an optional secondary 
l
grounding cable. 
 
Grounding screw: for connecting an optional secondary grounding cable.
l
22
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
for 1 Secondary Unit (left), for 2 Secondary Units (right)
Figure 11: Connection Unit with glands bottom interface
for 1 Secondary Unit (left), for 2 Secondary Units (right)
Figure 12: Secondary Unit bottom and side interfaces

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se7k-n4Se5k-n4Se4k-n4Se3k-n4

Table of Contents