Synergy Manager External Cable Interface; Synergy Unit Interface Connectors - SolarEdge SEK-I Series Installation Manual

Three phase inverter
Table of Contents

Advertisement

Synergy Manager External Cable Interface

The conduit entries, at the bottom side of the Synergy Manager, interfaces the inverter
to the grid and PV strings. The communication glands, support communication cables
connecting the inverter to the SolarEdge Monitoring platform and external power bank
used for setting up the inverter in sites with no available grid power.
AC Conduits Entry: drill guides for conduits running AC cable from the grid
DC Conduits Entries: drill guides for conduits running DC cables from the PV Strings
Power Bank Input: power bank connection enables inverter pre-commissioning
when AC power is not connected
Communication Glands: two communication glands for connecting
communication and antenna cables. Refer to Setting Up Communication with the
Monitoring Platform on page 60.

Synergy Unit Interface Connectors

The Synergy Unit connectors are used to interface the Synergy Unit to the Synergy
Manager:
DC connectors: for DC input from the Synergy Manager
Communication connector: for communication with the Synergy Manager
AC connector: for supply of AC power to the Synergy Manager
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
Chapter 3: Installing the Synergy Manager and Synergy Units
Figure 13: Synergy Manager - bottom view
    34

Advertisement

Table of Contents
loading

Table of Contents