Zetor UTILIX HT 45 Operator's Manual page 61

Hide thumbs Also See for UTILIX HT 45:
Table of Contents

Advertisement

Implement hitching and unhitching
To hitch an implement to the drawbar, proceed as follows
- Remove lock pin 1
- Remove pin 2
- Reverse the tractor slowly up to the implement
- Insert pin 2
- Insert lock pin 1
Drawbar Type Maximum Horizontal load Maximum Vertical load Rear Tyre
T-CD1
6000kg
Technically permissible towable masses
Unbraked towable mass
Independently braked towable mass
Inertia-braked towable mass
Towable mass when fitted with hydraulic or pneumatic braking N/A
Tractor identification plate
The tractor serial number is stamped on aluminum plate locates on the LH side of the axle frame.
CONTROLS, INSTRUMENTS & OPERATIONS
500daN
13.6-26, 8PR(R1)
17.5L-24, 8PR(R3)
17.5L-24, 8PR(R4)
1,600 kg
3,000 kg
6,000 kg
60

Advertisement

Table of Contents
loading

This manual is also suitable for:

Utilix ht 55

Table of Contents