Manifold - Aqua Lung G3000SS Operation & Maintenance Manual

Diving helmet
Hide thumbs Also See for G3000SS:
Table of Contents

Advertisement

Step 1: Break down of manifold
assembly.
Step 4: Install o-ring (26) onto man-
ifold plug (43). Screw manifold plug
to the manifold body (45).
Step 7: Tighten port plug (46) with
a 3/16" hex key until to 45 in.lbs
(5 Nm).
Step 10: Screw scuba fitting (48)
(with Teflon tape) to the first check
valve (47) and tighten firmly.

MANIFOLD

Step 2: Insert screen (44) into the
manifold body (45). Failure to install
may cause debris to block the flow
of gas to the diver.
Step 5: Tighten the manifold plug
(43) with a 7/8" socket to 90 in.lbs
(10 Nm).
Step 8: Screw check valve (47)
(with Teflon tape) into the first
port of the manifold body (45).
Step 11: Screw hose fitting (49)
(with Teflon tape) to the 2nd check
valve (47) and tighten firmly.
Step 3: Line up screen (44) with
the end of threads in the manifold
body (45).
Step 6: Install o-ring (33) onto
port plug (46). Using a 3/16" hex
key, screw the port plug to the
manifold body (45).
Step 9: Screw check valve (47)
(with Teflon tape) into the 2nd
port of the manifold body (45).
Step 12: Tighten both check valve
assemblies to the manifold body
(45) with an 7/8" socket. Replace
caps (50).
29

Advertisement

Table of Contents
loading

Table of Contents