Installing 1-1/4" Roll Tube; Installing 1" Tie Down Tube - J&M 525 Setup Manual

Grain cart roll tarp
Hide thumbs Also See for 525:
Table of Contents

Advertisement

Prepare the canvas tarp . Spread the canvas tarp out so that the stiffening patches are on the opposite auger side with the shiny
side down .
For grain carts with a capacity of 875 bushels and lower, slide the tarp guide roller onto the 1-1/4" square roll tube . Install the
1-1/4" square roll tube through the front end of the opposite auger side canvas tarp end .
For grain carts with a capacity of 1,000 bushels or greater, slide the 1-1/4" square roll tube through the rear end of the opposite
auger side canvas tarp end . Slide the tarp guide roller onto the front end of the 1-1/4" square roll tube . Slide the cable spool into
the front end of the 1-1/4" square roll tube . Line up the holes in the cable spool with the holes in the 1-1/4" square roll tube and
insert the roll pin .
1-1/4" Square Roll
Tube
Feed the 1" square tie-down tube through the auger side tarp end . On the front of the grain cart, measure 3" from the end of the
tube . This is where the canvas tarp should stop . Now measure 3/4" on the canvas tarp . Drill a 1/4" hole through the tarp and the
first wall on the tube . Next install a pop rivet using a hammer . Now go to the opposite end of the same tube and pull the tarp
tight . Measure 3/4" from the end of the tarp, drill a 1/4" hole and install another pop rivet .
12
Installing 1-1/4" Square Roll Tube
1" Square Tie-
Down Tube

Installing 1" Tie Down Tube

3/4"
3"
1-1/4" Square
Roll Tube
Canvas Tarp
Opposite
Auger
Side
Front of Cart
1" Square Tie-
Down Tube
Auger Side

Advertisement

Table of Contents
loading

Table of Contents