Thermo Scientific Dionex Aquion RFIC Operator's Manual page 135

Ion chromatography system
Table of Contents

Advertisement

Thermo Scientific
Figure 78. Disconnecting the Dionex CR-TC liquid lines
Disconnect liquid
lines from 4 ports
4. Remove the new Dionex EGC holder (P/N 058069) from the shipping box.
5. Turn the holder upside down (see
CR-TC.
Tip To help retain the fittings and ferrules on the lines, remove the coupler from each
line just before connecting the line to a port.
Figure 79. Dionex EGC holder (upside down)
Metal stud for mounting the CR-TC
6. After checking that none of the lines are caught under the Dionex CR-TC, begin pushing
the column onto the metal stud inside the Dionex EGC holder. Continue pushing down
until the Dionex CR-TC snaps into place (see
Replacing the Dionex EGC Holder and Degas Assembly
Figure
79) and connect the liquid lines to the Dionex
Couplers
Figure
80).
Dionex Aquion RFIC Operator's Manual
6
Service
119

Advertisement

Table of Contents
loading

Table of Contents