Making Connections To The Terminal Board - Baker Hughes Masoneilan SVI II ESD Quick Start Manual

Sil3 emergency shutdown device & pst controller
Table of Contents

Advertisement

Making Connections to the Terminal Board

Each terminal block on the terminal board has a cage clamp connector. One side of the connec-
tor has the actual connection for the wire, with a lever at the top. If there is an option present that
is not properly connected to the terminal board or if adding a new option, connect the wires from
the option as follows:
1. If the option's wires have not been stripped, strip the insulation at the end of wires.
2. Locate the correct terminal block on the terminal board (see Figure 15 on
page 49).
3. Push the lever back at the top connector until you see the opening for wire
insertion. The connectors are spring activated and may require a lot of pressure to
move the lever.
4. Insert the wire into the opening and release the lever.
NOTE
NOTE
© 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Improperly or inadequately grounded installations can cause
noise or instability in the control loop. The internal electronic
components are isolated from ground. Grounding the case is
unnecessary for functional purposes but grounding the case may
be necessary to conform to local codes. Side loading the cage
clamp lever can cause damage.
Position Retransmit: when wiring this feature:
Wire using the same gauge wire as for the 4-20 mA control loop.
In general, ensure that it is connected to the control system's
analog systems card.
Ensure the control loop is powered when using a meter to make
any measurements.
Masoneilan SVI II ESD Quick Start Guide =| 51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Masoneilan svi ii esd sil3

Table of Contents