Installation

Compliance voltage testing is best done before installation. See "Determining an SVI Positioner
Compliance Voltage in a Control System" on page 97.
The steps necessary to complete the SVI II ESD installation and software setup are outlined in
Table 1.
Step No.
Attach mounting bracket to the 
1
actuator.
Install the SVI II ESD magnetic assem-
2
bly (rotary valves only).
Assemble the SVI II ESD on the bracket
3
that is mounted to the valve actuator.
Connect the pneumatic tubing to the
4
SVI II ESD.
Connect the air supply to the SVI II
5
ESD.
6
Install the wiring for the SVI II ESD.
Connect the PST controller to the
7
HART
installing the SVI II ESD wiring.
8
Power up the SVI II ESD.
If appropriate, configure/calibrate
using ValVue ESD
9
If appropriate, configure/calibrate
using a HART
Communicator
WARNING
22 | =BHGE
Table 1: SVI II ESD Installation Steps
Procedure
®
Control Loop segment by
®
Hand Held 
Failure to adhere to the requirements listed in this manual may
cause loss of life and property.
Before installing, using, or carrying out any maintenance tasks
associated with this instrument, READ THE INSTRUCTIONS
CAREFULLY.
See page 25 for rotary valve and
page 30 for reciprocating valve
instructions.
See page 25 for instructions.
See page 25 for rotary valve and
page 30 for reciprocating valve
instructions.
See page 35 for instructions.
See page 39 for instructions.
See page 40 for instructions.
See page 42 for instructions.
See page 44 for instructions.
See page 62 and page 66 for
instructions.
See page 67 for instructions.
© 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Reference

Advertisement

Table of Contents
loading

This manual is also suitable for:

Masoneilan svi ii esd sil3

Table of Contents