Baker Hughes Masoneilan SVI II ESD Quick Start Manual

Sil3 emergency shutdown device & pst controller
Table of Contents

Advertisement

Quick Links

*
Masoneilan
*
SVI
II ESD SIL3 Emergency Shutdown
Device & PST Controller
Quick Start Guide
(Rev. M)
BHGE Data Classification: Public

Advertisement

Table of Contents
loading

Summary of Contents for Baker Hughes Masoneilan SVI II ESD

  • Page 1  Masoneilan II ESD SIL3 Emergency Shutdown Device & PST Controller Quick Start Guide (Rev. M) BHGE Data Classification: Public...
  • Page 2 MENT SHALL NOT BE REPRODUCED IN WHOLE OR IN PART TO ANY THIRD PARTY WITHOUT THE WRITTEN APPROVAL OF BHGE. Copyright Copyright 2018 by Baker Hughes, a GE company LLC. All rights reserved. PN 055201359-999-0000 Rev. M. © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
  • Page 3 Changed ES version to V. L/12-2017 Updated Load Limits section. Updated ES-727 to Rev. W. M/01-2018 Updated Load Limits section. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 3...
  • Page 4 This page intentionally left blank.
  • Page 5: Table Of Contents

    Operation, Setup, Commissioning ................18 Maintenance ........................18 Diagnostics ..........................18 PST ...........................18 Installation and Maintenance .....................21 Introduction .........................21 Using the Quick Start Guide ..................21 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 5...
  • Page 6 Partial Stroke Test Diagnostics ................69 Partial Stroke Testing ......................70 PST Configuration .....................70 Starting PST .........................71 Specifications and References ...................73 Physical and Operational Specifications ...............73 Hazardous Location Installation ................78 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 6 | =BHGE...
  • Page 7 ValVue Commands ....................96 Determining an SVI Positioner Compliance Voltage in a Control System ..97 Compliance Test Set-Up....................97 Burst Mode Operations ......................99 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 7...
  • Page 8 This page intentionally left blank.
  • Page 9: Safety Information

    Unde- tected Fail  Failure that is dangerous but is detected by automatic stroke  Danger- testing. Detected Masoneilan SVI II ESD Quick Start Guide =| 9 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
  • Page 10: Acronyms

    Safety Instrumented System – Implementation of one or more Safety Instrumented Functions. A SIS is composed of any combination of sensor (s), logic solver (s), and final element (s). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 10 | =BHGE...
  • Page 11: Documentation Symbols

    Indicates a potentially hazardous situation, which if CAUTION not avoided could result in instrument or property damage, or data loss. Indicates important facts and conditions. NOTE © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 11...
  • Page 12: Product Safety

    Before using these products with fluids/compressed gases other than air or for non-industrial applications, consult the factory. This product is not intended for use in life support systems. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 12 | =BHGE...
  • Page 13: Product Support

    IEC 61508: 2000 – Functional safety of electrical/electronic/programmable electronic safety-related systems ANSI/ISA 84.00.01-2004 (IEC 61511 Mod.) Functional Safety – Safety Instrumented Systems for the Process Industry Sector © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 13...
  • Page 14: Designing An Sif Using An Svi Ii Esd

    The SVI II ESD is intended to be part of final element subsystem as defined per IEC 61508 and the achieved SIL level of the designed function must be verified by the designer. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 14 | =BHGE...
  • Page 15: Environmental Limits

    Safety Integrity Level will not be achieved. SIL Capability The SVI II ESD meets SIL 3 requirements as outlined below. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 15...
  • Page 16: Connecting The Svi Ii Esd To The Sis Logic Solver

    The output rating of the I/O module must meet or exceed the electrical specifications of the SVI II ESD as referenced in ES727 (“Hazardous Location Installation” on page 78). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 16 | =BHGE...
  • Page 17: Installation

    Refer to “Physical Location and Placement Guidelines” on page 23. Pneumatic Connections Refer to “Pneumatic Connections” on page 35. Electrical Connections Refer to“Electrical Connection Guidelines” on page 40 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 17...
  • Page 18: Operation, Setup, Commissioning

    Partial Stroke Testing (PST) diagnostics You can configure and run PST at runtime. For more information on PST refer to “Partial Stroke Testing” on page 70. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 18 | =BHGE...
  • Page 19 The person (s) performing the proof test of an SVI II ESD must be trained in SIS operations, includ- ing bypass procedures, maintenance and company Management of Change procedures. No special tools are required. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 19...
  • Page 20 This page intentionally left blank.
  • Page 21: Installation And Maintenance

    SVI II ESD Instruction Manual GEA18946. If you experience problems that are not documented in this guide refer to the Masoneilan SVI II ESD Instruction Manual SIL3, GEA18946, or call your local representative. Sales offices are listed on the last page of this document.
  • Page 22: Installation

    Failure to adhere to the requirements listed in this manual may cause loss of life and property. Before installing, using, or carrying out any maintenance tasks associated with this instrument, READ THE INSTRUCTIONS CAREFULLY. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 22 | =BHGE...
  • Page 23: Physical Location And Placement Guidelines

    Bleed air from actuator and check that valve is in its de-energized position. It is now safe to disconnect and remove any valve mounted equipment that is being replaced. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 23...
  • Page 24: Svi Ii Esd Components

    SVI II ESD Cover SVI II ESD Assembled Pneumatic Train and Cover (I/P Module, Relay) Manifold Electronics Module Pneumatic Relay Figure 2 SVI II ESD Components © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 24 | =BHGE...
  • Page 25: Mounting The Svi Ii Esd On Rotary Valves

    Check that the end play from the vacuum position to the fully extended position is less than 0.06 in. (1.524 mm). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 25...
  • Page 26 10. Ensure no interference exists with the position sensor protrusion. 11. Ensure that the V-Seal makes contact with the skirt around the position sensor protrusion on SVI II ESD housing. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 26 | =BHGE...
  • Page 27: Travel Sensor Alignment

    General Rule for Any amount of rotation 50% Travel 0 +/- 1000 other  Clockwise or counter- (Mid-Stroke) configurations clockwise (0°) Masoneilan SVI II ESD Quick Start Guide =| 27 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
  • Page 28: Mounting The Svi Ii Esd With Namur Kits

    Figure 4 Namur 20/30 mm Mounting Kit 2. Place the indicator disk with metal insert over the valve actuator shaft and secure using an M6 x 1.0 x 45 socket-head screw. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 28 | =BHGE...
  • Page 29 4. Place the Quarter Turn Mounting Plate into place sliding it over the lever and through the anti-backlash spring. 5. Secure the bracket using four (4) flat head cap screws. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 29...
  • Page 30: Mounting The Svi Ii Esd On Reciprocating Valves

    5⁄16 - 18 UNC cap screws.The mounting location of the bracket depends on the size and stroke of the actuator. Refer to Figure 7 and Table 3 on page 32. Figure 7 Reciprocating Valve Mounting Bracket © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 30 | =BHGE...
  • Page 31 11. Adjust the turnbuckle until the hole in the SVI II ESD lever is aligned with the indicating hole in the bracket. Tighten both turnbuckle lock nuts. Refer to Figure 7. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 31...
  • Page 32 (12.7 - 20.32 mm) (133.35 mm) >0.8 – 1.5" 5.25" (20.32 - 41.5 mm) (133.35 mm) >1.5 – 2.5" 5.25" (41.5 - 63.5 mm) (133.35 mm) © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 32 | =BHGE...
  • Page 33: Checking The Magnet

    5. Select the Check tab to view the current operating conditions of the selected PST Controller. 6. Read Raw Position Data on the Check screen (Figure 10). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 33...
  • Page 34: Checking Actuator, Linkages, Or Rotary Adapter

    Verify Mounting and Linkage Adjustment Inspect the mounting and make any needed adjustments before running the PST Controller and checking the digital configuration. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 34 | =BHGE...
  • Page 35: Connecting The Tubing And Air Supply

    At least 18° F (10° C) below minimum anticipated ambient temperature Particulate Matter Filtered to 5 microns Oil Content Less than 1 ppm w/w Contaminants Free of all corrosive contaminants © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 35...
  • Page 36 Remote piping of the actuator venting is possible to reduce the amount of natural gas released into the area around the SVI II ESD (See GEA18946 Masoneilan SVI II ESD Smart Valve Interface with SIL3 Emergency Shutdown PST Controller Installation and Maintenance Manual for further discussion on installing an SVI II ESD in a natural gas environment).
  • Page 37 Isolate the valve from the process and disconnect air tubing from the positioner. Disconnect air fully to avoid injury or process damage. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 37...
  • Page 38 30 -120 psi (2.07 - 8.28 bar) (207- 827.6 kPa) Minimum tubing diameter 1⁄4" (6 mmx4 mm) Output Supply Figure 11 Air Ports on Single Acting PST Controller © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 38 | =BHGE...
  • Page 39 For detailed information on pneumatic connections refer to “Pneumatic Connections” on page 35. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 39...
  • Page 40: Wiring The Svi Ii Esd

    CAUTION Refer to “Optional Switch Load Limits” on page 93“ for guidelines on safely wiring switch load limits. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 40 | =BHGE...
  • Page 41 Safety Function Triggered by Discrete 0 - 24 VDC Signal (3 VDC = Safety Trip) Figure 13 Discrete Safety Demand (DSD) Configuration © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 41...
  • Page 42 3. Connect the other end of the cable to the SVI II ESD. There are two threaded openings on the positioner. Use the opening with the red plastic insert. 4. Maintain polarity + and - respectively. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 42 | =BHGE...
  • Page 43 Grounding the case is unnecessary for functional purposes but grounding the case may be necessary to conform to local codes. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 43...
  • Page 44: Powering Up The Svi Ii Esd

    NOTE When an SVI II ESD is turned on it is advisable to apply the air supply before applying the electrical input signal. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 44 | =BHGE...
  • Page 45 5. Proceed to Configuration on “Configuration” on page 62 and “Calibration” on page 66. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 45...
  • Page 46 (on the terminal board). The voltage source + must connect to the terminal board connector +, and the same for -. Figure 17 on page 50. 6. Reinstall the cover and display. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 46 | =BHGE...
  • Page 47 8. Proceed to“Configuration” on page 62 and “Calibration” on page 66. NOTE The safety function of the SIF (shutdown of the valve on demand) must be tested after installation. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 47...
  • Page 48 ESD Status Local PST ESD Status Local (1) Latching is software configurable. ® (2) 1 - 5 VDC variable is sent using HART command #3 as the variable TV. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 48 | =BHGE...
  • Page 49 Output Switch SW #1 Process Variable 24 VDC IN Input Signal Display Figure 16 Connections to DSD Electronics Module (via Terminal Board) © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 49...
  • Page 50 Output Switch SW #1 Process Variable Digital Signal 24 VDC IN 4- 20 mA Input Signal Input Signal Display Figure 17 Connections to A/DSD Electronics Module (via Terminal Board) © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 50 | =BHGE...
  • Page 51: Making Connections To The Terminal Board

    In general, ensure that it is connected to the control system’s  analog systems card. Ensure the control loop is powered when using a meter to make any measurements. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 51...
  • Page 52: Svi Ii Esd Maintenance

    We reserve the right to modify or improve the designs or specifications of such products at any time without notice. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 52 | =BHGE...
  • Page 53: Display Cover Removal And Installation

    2. Lift the cover off the positioner. Display Cover Pneumatic Cover Figure 18 SVI II ESD Pneumatic and Display Covers © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 53...
  • Page 54 No wires or retaining cable can be trapped under the cover flange. The flange area is not corroded and the surface is not scarred. The four cover bolts are securely tightened to 50 in/lb. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 54 | =BHGE...
  • Page 55: Setup, Calibration And Pst

    Information in the Masoneilan SVI II ESD Smart Valve Interface with SIL3 Emergency Shutdown PST Controller Installation and Maintenance Manual. Masoneilan SVI II ESD Quick Start Guide =| 55 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
  • Page 56 Displays the parameters set in CONFIG and PST CONF. VIEW ERR Displays all current errors. CLR ERR Clears current errors, one at a time. RUN PST Executes PST (Partial Stroke Testing). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 56 | =BHGE...
  • Page 57: Accessing Pushbuttons

    When an exclamation point (!) appears in the SVI II ESD display window, it indicates instrument status available. (Forward) (Back) (Select) Figure 19 SVI II ESD Display Pushbuttons © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 57...
  • Page 58: Pushbutton Locks And Configuration-Lock Jumper

    2. Select the Configure tab to view and change the current Button Lock configuration. ValVue ESD Connected Devices Screen ValVue ESD Configure Screen Figure 20 Checking Pushbutton Locks Using ValVue ESD © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 58 | =BHGE...
  • Page 59: Modes Of Operation

    Wire a button to the DI terminal. The DI terminal resets the LATCH condition by means of a short circuit on its input. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 59...
  • Page 60 5.6 mA (ASD and A/DSD) or 3 VDC (A/DSD and DSD). Setup In the Setup mode, you can set calibration and configuration parameters. Additionally, you can run response time tests, step response tests, and valve signatures. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 60 | =BHGE...
  • Page 61 CALIB MANUAL CONFIG PST CONF Config Calib PST Conf Menu Menu Menu Figure 21 NORMAL Operation and MANUAL Menu Structures © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 61...
  • Page 62: Configuration

    NOTE In this document, all calibration and configuration procedures are described using ValVue ESD software and an SVI II ESD with pushbuttons and display. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 62 | =BHGE...
  • Page 63 Server 2008, XP SP2, or 7, 64 MB RAM, a serial or USB port ® connected to a HART modem. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 63...
  • Page 64 Press * to access and change the parameter. b. Press + to move to the next parameter. c. Press + to return to SETUP. d. Press + to return to NORMAL mode. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 64 | =BHGE...
  • Page 65 5. Press + until CLR ERR appears. 6. Press * CLR ERR. WAIT is displayed for a second or two. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 65...
  • Page 66: Calibration

    10. Press * to cause the valve to stroke and to automatically calibrate valve travel. 11. After the STOPS procedure finishes, press + twice until TUNE appears. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 66 | =BHGE...
  • Page 67: Check-Out With A Hart® Handheld Communicator

    HART communications. For example, the following message appears if the instrument has been serviced and the air is not connected. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 67...
  • Page 68 (Position Error, for example) or go to the troubleshooting guide. 14. Correct the problem (Is the air supply on?), and then go to clear status until Clear Fault codes Completed appears. 15. Press OK. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 68 | =BHGE...
  • Page 69: Diagnostics

    For most fault conditions, the ESD device attempts to remain in the energized state until an ESD command is given (unless specified otherwise during setup). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 69...
  • Page 70: Partial Stroke Testing

    When using ValVue ESD to configure PST: 1. Select the Configure screen in ValVue ESD. 2. Set the PST parameters to the appropriate settings. 3. Apply and save changes. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 70 | =BHGE...
  • Page 71: Starting Pst

    Analog set to 16.4 mA ValVue ESD ® Handheld or any HART Host with DD support Scheduled Built-In calendar in SVI II ESD © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 71...
  • Page 72 This page intentionally left blank.
  • Page 73: Specifications And References

    1 G at 150 - 2000 Hz - Less than 2% of span Magnetic Field Influence Negligible at 30 A/m (EN61000-4-8) CE MARK certified to EN50081-2 and EN50082-2 Masoneilan SVI II ESD Quick Start Guide =| 73 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
  • Page 74 Boost: 0 to 20 more responsive values. Start Up Time (from no power) Less than 200 mS ® Minimum current to maintain HART 3.0 mA © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 74 | =BHGE...
  • Page 75 Display becomes unreadable between 0 °C and -10 °C. Display is shutdown at -15 °C. Three Explosion Proof / Flameproof push  Push Buttons buttons © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 75...
  • Page 76 4-20 mA input signal PV = Valve Position, 0-100% SV = Actuator Pressure (P1-P2) TV = Supply Pressure QV = P2 for double acting units (not applicable) © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 76 | =BHGE...
  • Page 77 120 psi (8.28 bar, 828 kPa) max 0.59 filling, 0.72 venting Sweet Natural Gas S content not more than 20 ppm © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 77...
  • Page 78: Hazardous Location Installation

    The following pages provide the agency approved installation procedure for hazardous locations (ES-727). NOTE The installation procedure is accurate at time of print. For further hazardous installation information please consult the factory. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 78 | =BHGE...
  • Page 79 GE Oil & Gas ES-727 SPECIAL INSTRUCTIONS FOR INSTALLING MASONEILAN SVI II ESD IN AREAS WHERE THERE IS A POTENTIAL FOR EXPLOSIVE GAS ATMOSPHERE OR INFLAMMABLE DUST Doc Number ES-727 PDR ECO- Written By P.Levesque 13DEC2006 Revision 11/15/2017 0029774 Checked T.Kabir...
  • Page 80 Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 80 | =BHGE...
  • Page 81: Definitions And Abbreviations

    Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 81...
  • Page 82: Model Number Description Of Svi Ii Esd

    Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 82 | =BHGE...
  • Page 83: Intrinsically Safe Requirements

    Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 83...
  • Page 84: Description Of Flameproof And Intrinsically Safe Markings

    Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 84 | =BHGE...
  • Page 85 Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 85...
  • Page 86 Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 86 | =BHGE...
  • Page 87: Figure 1, Intrinsically Safe Installation Wiring Requirements

    Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 87...
  • Page 88: Notes For Intrinsically Safe Installation

    Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 88 | =BHGE...
  • Page 89 Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 89...
  • Page 90 Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 90 | =BHGE...
  • Page 91: 10 History

    Copyright 2017 as an unpublished trade secret. This document and all information herein is the property of Dresser LLC. It is confidential and must not be made public or copied and is subject to return upon demand. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 91...
  • Page 92 This page intentionally left blank.
  • Page 93: Optional Switch Load Limits

     0.200 mA (Switch leakage current) 1 A max. SWITCH Incorrect polarity connection results in an CAUTION effectively closed connection. Masoneilan SVI II ESD Quick Start Guide =| 93 © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
  • Page 94 EMF voltage spikes. External SVI II ESD Switch Output:  1 Voltage V with switch ON Source Figure 24 Simplified Switch Installation Drawing: Correct Configuration © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 94 | =BHGE...
  • Page 95 Option #2. The barrier must have adequate resistance to limit inrush current, as the fuse cannot limit inrush current (see Wiring Option #2). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 95...
  • Page 96: Checking Switch Operation

    4. Select Command 142 Read Switches from the pulldown list and click Send Cmd. The information field below populates with the configured switch states. Ensure that the switch just reconfigured has changed state. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 96 | =BHGE...
  • Page 97: Determining An Svi Positioner Compliance Voltage In A Control System

    4. Read the voltage across the potentiometer, which should be > 11 VDC. This is the available system voltage at the minimum output. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. Masoneilan SVI II ESD Quick Start Guide =| 97...
  • Page 98 9.5 to 10.5 V 12 mA 10 V 9 to 10 V 16 mA 9.5 V 8.5 to 9.5 V 20 mA 8 to 9 V © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 98 | =BHGE...
  • Page 99: Burst Mode Operations

    The Burst mode can send the following commands: Cmd1: PV Cmd2: %range/current Cmd3: Dyn vars/current Cmd9: Device vars w/status Cmd33: Device variables Figure 28 Burst Mode Configuration Masoneilan SVI II ESD Quick Start Guide =| 99 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
  • Page 100 © 2018 Baker Hughes, a GE company, LLC. - All rights reserved. Baker Hughes, a GE company, LLC and its affiliates (“BHGE”) provides this information on an “as is” basis for general information purposes and believes it to be accurate as of the date of publication.

This manual is also suitable for:

Masoneilan svi ii esd sil3

Table of Contents